Sportcampus Zuiderpark Den Haag

Sportcampus Zuiderpark in The Hague was built on the site of the former stadium of ADO Den Haag and opened on 14 June 2017. 

COS Tribunes

The top sports hall is equipped with telescopic stands, which are connected to the fixed stands on the long sides. The telescopic stands at the ends have an integrated fixed structure with a staircase that allows crossing from left to right. 

Rigid chain propulsion

The stands are all equipped with a push chain drive system. The chain system operates completely independently of the floor. 

Finishing and seats

The visible and invisible metal structure is powder coated in RAL 9005 black. The stand structures have high quality plywood floor panels with an anti-slip phenolic resin coating in a hexagonal structure.  The edges are finished with aluminium profiles. The sides of the stands are fitted with PVC panel curtains. 

The comfortable Abacus chairs were designed, manufactured and supplied by our partner Forum Seating of Poland, one of our chair partners. The seats on the telescopic stands are placed in sets, on the architectural stands they are fixed.

117 Audyt 1 conference chairs have been delivered and installed in the lecture theatre. These are manufactured by our partner Sella Seating.

Project Details

  • Location: Zuiderpark, The Hague - Sportcampus Zuiderpark
  • Client: Municipality of The Hague
  • Users: Haagse Hogeschool, ROC Mondriaan, Municipality of The Hague
  • Architect: FaulknerBrowns Architects, Newcastle upon Tyne - FalknerBrowns
  • Architectural design: ABT, Delft 
  • Management: Alphaplan, Alphen aan den Rijn, The Netherlands
  • Structural engineer: ABT, Delft
  • Installation consultant: Deerns, Rijswijk
  • Building physics and fire safety consultant: ZRi, The Hague
  • General contractor: TeamSport Zuiderpark v.o.f.: Ballast Nedam and Kuijpers Installatie - Ballast Nedam - Kuijpers
  • Steel construction: Oostingh Staalbouw, Katwijk and Hutten Metaal, Hardenberg
  • Façade construction: Ridder Systems, Zwaag - Ridder Systems
  • Gross floor area: 32,320 
  • Construction costs: € 47,322,000 including installations, excluding VAT
  • Construction period: March 2015 - April 2017

Copyright banner photo: Arjen Schmitz photographer